Archive

Eight additional daily round-trips on existing passenger rail corridor and 16-24 new cars required. Improve freight capacity by separating passenger and freight rail traffic. Largely a sea level rise adaptation project; wetlands restoration project too. Multiple angles on funding approach. Federal 80%/State, Local, Private 20%...

Improved reliability of signal system achieved by upgrading outdated signal equipment. Statutorily Exempt-within existing rail Right-of-way. Federal 80%/State, Local, Private 20% shares are for illustrative purposes only and any proposed project shares may differ....

0.5 mile siding in single track territory, improved fluidity of passenger train operations will have added benefit for freight trains as well. Statutorily Exempt-within existing rail Right-of-way. Federal 80%/State, Local, Private 20% shares are for illustrative purposes only and any proposed project shares may differ....

One city served by new passenger rail corridor, one new or improved station, reduce passenger rail travel time by 13 minutes, 17.3 miles of PTC, improve freight capacity by separating passenger and freight rail traffic. Re-route of existing service. No federal funds identified. NEPA not...